Trailer made this job a lot easier

OSM-Jo

New member
We did a large paint prep job this weekend for a local church in Montgomery. The walls were oxidized real bad and needed to be prepped before they could repaint. This wall was 20 ft tall and nearly 200 ft long. Scaffolding would have been expensive, a lift meant constant moving and repositioning, but our 30 ft trailer worked out great. Set up, washed a section and just drove down the wall as needed. Here's a few pics of the job.
 

Attachments

  • REC31211.jpg
    REC31211.jpg
    587.1 KB · Views: 153
  • REC31211_Trailer.jpg
    REC31211_Trailer.jpg
    540 KB · Views: 173
I have done almost the same thing with the big bucket truck.

The top side tool boxes are about 8' from the ground so I just stand on top of them and they are about 12' long so I can wash about 16' more or less before I have to move the truck, kind of like a moving scaffold.
 
We don't take this trailer out much anymore, just when its needed. Normally roll with our 16 footer.
 
Back
Top