What a difference it makes.
How long did it take you do finish that job?
I would have given you some rep points for that.![]()
I walked in the back down at 8:50am, the system was cleaned by 10:30am. Then did the walls shelves and equipment, around 10:45am owner wanted my input on remodeling.
So I measured it out and will be making 2 circle booths 1 corner @ 15' and 10' and 5 doubles and 4 singles. All doubles & singles @ 48"![]()
He also wants some awnings made![]()
are you going to do the bath room stalls.