Dan, check out signature rules. then you might get and answer.

This is a freind of mine that was around with me 20 years ago. He and my brother washed with me on my first project.

they actually had a chance for a piece. Dan you could still be in az.
 
$1300.00 seems fair.How many sq ft is the building,is it multi level?is there any special equipment needed to do the job?
 
One level,i just seen it on your post..
 
LITTLE GUYS said:
Do You Price New Constrution By The Brick Or Sq. Ft.

I have been doing this for awhile now,and i estimate every job i do by time and materials.If they can give me a sq ft i can give them a price.If the job requires a lift or is hard to get to,or i have to bring in my own water,well then i just add in all the extra time.Keep it simple,how it normaly works out for me is between $100.00 to $150.00 an hour with (2) guy's..:D
 