Just a little rant. Had to submit bids on a contract I had been doing for the last two years. I figured I could continue to do this for the same price I had been doing it for. I was told I was 40% higher than the accepted bid. I figured the job at the awarded price and deducted the cost of gas,fuel and chemicals, nothing else as for as insurance,cost of equipment etc. The hourly rate came out to $18.00 an hour. How can folks operate at this.