In the past I have wined, screamed, pulled my hair and even ground my teeth... Had a call on new construction, to just clean the decks... 12 decks in total, well 8 really the other 4 had concreat bottoms with rails... decks were 9 by 18 with 18 running foot of rails, no steps... you will have to go through condos,3 stories up, 6 on the back 6 on the front...so what we have is 8 decks at 9 by 18 and 18 running foot of rails, and four with 9 by 18 concreat bottoms and 18 running foot of rail...
What would you guys bill the job at? I will post my bid after I get some replys, so I dont get laughed at my bid...
thanks,
Matt
What would you guys bill the job at? I will post my bid after I get some replys, so I dont get laughed at my bid...
thanks,
Matt