I have sold entire tracks of homes just flatwork for 650 each home.
This PO is very old and was for 240.00 per home and was sold 375 each.
We did 6 to nine on average with one man. Tracks often got completed in arizona in a few months.
Incase some of you cant do math , thats 90,000 a track back in the early 2000